20.08.2017.

Termomatik finished electrical and part of gas installation on new gas furnace in Germany as subcontractor.


Image description
Image description
Image description
Image description
Image description

31.10.2017.

Termomatik got FAC of complete project for delivery of electrical furnace in automotive.

End user of treated parts is Schaeffler Group and Timken.

This is second electrical furnace in last six years in same company for same end customer.


21.05.2017.

Termomatik starts testing of new furnace in Bosnia, as main contractor.

Company developed complete electrical furnace inclusive mechanical, refractory, electrical projecting and delivery.

Control system is based on SIMATIC 315-2 DP CPU, WinCC 7.4 SCADA, WinCC flexible, 6 SINAMICS V20 drives on 6 SIMOGEARs, STEP7.

Scope of Termomatik supply: Automation system projecting in EPLAN P8, installing, testing, supervision, startup,

mechanical and hydraulical engineering, production, errection and startup. Total power 380 kW.

System includes conveyor system.

Image description


17.01.2017.

Termomatik got FAC for project of reconstruction of 25 years old SMS-Hasenclever hydraulic 3500 t press in Africa.

After start of sytem (PAC) in April 2016, FAC is achieved on 17.01.2017.

Control system is based on three SIMATIC 317 PN/DP, WinCC 7.0 SP3, WinCC flexible, 4 SINAMICS G120 drives, one DC drive.

Scope of Termomatik supply: Automation system projecting in EPLAN P8, installing, testing, supervision, startup,

reconstruction of hydraulic system (errection, new 6 pumps REXROTH, new hydraulic valves).


Image description


30.12.2016.

Termomatik got FAC for project reconstruction of Mixing station and SALEM furnace in ArcelorMittal Zenica for BLOOENG Europe.

After delivery of documentation AS BUILT, FAC is achieved.

Control system is based on SIMATIC 315F PN/DP for furnace, 314C for mixing station, WinCC 7.0 SP3, 4 SINAMICS G120 drives.

Scope of Termomatik supply: Automation system projecting in EPLAN P8, installing, testing, supervision, startup,

mechanical engineering and errection of mixing station, 80 t/h walking beam SALEM furnace, pneumatic installation.

Termomatik have delivered automation system in record 3 months time to site, and mechanical contructions.

Reconstruction of furnace was done in 22 days as planed.



29.12.2016.

FAC of project Charging Car in Arcelor Mittal Zenica Coke Oven Battery Plant is achieved.


25.11.2016.

Finished hot commissioning of Charging Car in Arcelor Mittal Zenica Coke Oven Battery Plant.

After one month of hot commissioning machine is in continious use.

Control system is based on SIMATIC 315 PN/DP, WinCC 7.0 SP3, SCALANCE Wi-Fi, 4 SINAMICS S120 drives.

Scope of Termomatik supply: Automation system projecting, installing, testing, supervision, startup; piping of hydraulic lines on machine.


10.08.2016.

Finshed cold commissioning of Charging Car in Arcelor Mittal Zenica Coke Oven Battery Plant.



November 2016.

Termomatik won new contract for delivery of electrical oven, 400 kW power.

5 years after delivery of first oven, second oven with new options is ordered.

Automation system is based on SIMATIC S5-315 2DP and scada WinCC 7.2.

End customers of product are SKF, FAG, Timken.


Oktober 2016.

After delivery of project documentation to Zeljezara Ilijas, FAC is reached.


04.08.2016.

Finished trial run of casting part factory in Zeljezara Ilijas.


28.06.2016.

Finished Hot commissioning of casting part factory.


30.04.2016.

Finish of assembling of casting part factory

Cold commissioning is on going.


January. 2016.

Assembly of casting factory (mechanical, electrical, hydraulic, pneumatic, water cooling) is on going...


December 2015.

As subcontractor Termomatik is to deliver control system for one Schiebel actuator on Department Energetika ArcelorMittal Zenica.

System is based on one SIEMENS CPU 1511-1 PN

 

Termomatik enter finish phase of reconstruction of 3500t press and service system based on 3 SIEMENS CPU 317-PN DP in Egypt.

 

Termomatik is working on startup of Coal charging Car on COBP in ArcelorMittal Zenica. Planned hot commissioning summer 2016.

 

Termomatik finished installation of system for pneumatic transportation of metalurgical samples inside ArcelorMittal Zenica.

Total length 200m, inclusive elcetrical system, 2 blowers, startup. After 2 lines installed 2011, this is third installed line.

 

Novemebr 2015.

As subcontractor in ArcelorMittal Zenica Termomatik finished electrical installation, cold commissioning, supervision at startup for 6 Shiebel actuators, 3 steam flowmeters, instalation of heating cables and insulation, piping of impuls line, instrumentalisation.

 

Termomatik successfuly started operation of 400t forming press in Egypt. System is based on SIEMENS CPU S7 1511-1.

 

Oktober 2015.

Termomatik is main contractor for assembling of used casting plant for car parts for Prevent Leather in Zeljezara Ilijas.

Assembling includes complete system for induction furnaces JUNKER, forming machine LORAMENDI, transport system - mechanical and electrical assmebly,

cold comissioning, supervision at startup. Planed hot commissioning april 2016.

 

January 2015.

Termomatik d.o.o. Zenica is main subcontractor for delivery of automation system for Bloom Engineering GmbH,

for project reconstruction of SALEM walking beam furnace and reconstruction of mixing-station for ArcelorMittal Zenica.

System is based on two PLC SIEMENS S7-300, 20 burner control units, one SCADA WinCC, one engineering station STEP7 Prof. and RIOs.

Company is also working on detailed mechanical engineering for mixing station and furnace reconstruction.

 

This project and dozens other delivered systems and jobs since year 2000 in ArcelorMittal (BH-Steel) Zenica put Termomatik d.o.o. on place

of leading supplier of Arcelor Mittal Zenica and longest life supplier.

 

References in ArcelorMittal (BH-Steel) Zenica:

- Reconstruction of 2 heating furnaces on cold air burners, automation system, mechanical, installation, startup, SIEMENS.

- Delivery of reduction station for natural gas, MSR3.

- Delivery of regulation station for natural gas on SALEM furnace, SIEMENS.

- Delivery of automation system for COBP, SIEMENS.

- Delivery of automation system for By-product plant, instrumnets, installation, startup, SIEMENS.

- Reconstruction of Water treatment plant for COBP, delivery of automation system, installation, startup, SIEMENS.

- Delivery of electrical system for portal crane no. 6 based on PLC and wireless communication, SIEMENS.

- Delivery of automation system for beaching unit, SIEMENS PLC and SINAMIC.

- Mechanical and electrical installation of SANDVIK crusher in sinter plant, reconstruction of conveyors, SIEMENS LV.

- Reconstruction of COBP flairstack.

- Delivery of conveyor for COBP amonia plant, mechanical and electrical, engineering, production, installation.

- Mechanical and electrical installation of two systems for automatic greasing based on SKF equipment, SIEMENS PLC.

- Delivery of 13 wind measuring devices for portal cranes, SIMENS PLC, installation.

- Delivery of 21 systems for alarming in case of emergency, installation.

- Delivery of 156 signal lights for cranes, installation.

- Delivery of automation system for pump station PS2 and PS10, SIEMENS PLC.

- Delivery of water dosing system for 3 mixers on sinter plant.

- Delivery of preheating devices for steel plant, based on natural gas, engineering, production, installation.

- Delivery of electrical furnace for thermocouple testing, engineering, production, installation, SIEMENS PLC.

- Reconstruction of PS9, power station, SIEMENS LV.

- Delivery of automation system for dedusting on mixer hall, mechanical pneumatic piping, installing, startup.

- Delivery of automation system for COBP coal charging car for JMH.

and many other smaller jobs.

 

Image description

COG and BFG mixing station, total length 46 m, power supply 35 kW.

______________________________________________________________________________________________________________________


Image description

Project: Delivery of new hydraulic press for customer in Africa:

- Electrical engeeniering in E-Plan, cabinets assembly, electrical errection on site, cold comissioning, software STEP7, SIEMENS CPU S7;

- Mechanical assembly, errection on site, comissioning.


Project: Delivery of new electrical furnace for Igman Konjic, Bosnia-Herzegovina, 2014. Scope of supply was:

- Electrical engeeniering in E-Plan, cabinets assembly, electrical errection on site, cold comissioning, software STEP7, SIEMENS CPU 313C-2 DP, SINAMICS;

- Mechanical engeeniering, mechanical assembly, errection on site, comissioning.  Installed power = 110 kW.


Charge Car

Project: Charge Car, ArcelorMittal Zenica, Bosnia-Hercegowina, 2014. As subcontractor our scope of supply was:

- Electrical engeeniering in E-Plan, cabinets assembly, electrical errection on site, cold comissioning, software STEP7, WinCC, SIEMENS CPU 315-PN/DP, SINAMIC S120;

- Hydraulical piping, pneumatic piping 

 

Image description

Delivery of electrical cabinets for Heidelberg Cement Kakanj


Image description

Mechanical reconstruction of flair stack in ArcelorMittal Zenica.


Image description

Project: PQSC facility, SMS-Meer Moechengladbach, Germany, 2013. As subcontractor our scope of supply was:

- Electrical engeeniering in E-Plan, cabinets assembly, electrical errection on site, cold comissioning, software STEP7,  SIEMENS CPU 315-PN/DP, SINAMIC G120;

 

Image description

Project: Projecting of transporter for amonium-sulphate, mechanical and electrical design, contruction, errection, startup, ArcelorMittal Zenica, 2013.


Image description

Project: Reconstruction of hydraulic system for water overflow control in hydro power plant Jablanica, Elektroprivreda BH, 2013.


Project: Errection of coal transport system in PP Tuzla Blok 6. As subcontractor. As subcontractor our scope of supply was:

- Electrical engeeniering in E-Plan, cabinets assembly, electrical errection on site, comissioning, software STEP7,  WinCC, SIEMENS CPU 412-2 PN, SINAMIC S120;

 

Background image

2 years warranty expired !

Bucket- Wheel Excavator SH-630